Powgen Project

Kogenerační jednotka TEDOMThe Project is aimed at extending and making the cogeneration production of power more efficient within the entire MVV Energie CZ Group. TEDOM was the winner of the selection procedure for the contractor of cogeneration units. The Project was realized since May 2009 to April 2010. This operation with a capital expenditure of 335.5 mill. CZK involved 7 localities. More

 

Reconstruction of the Central Heat Supply System in Zruc nad Sazavou
 

The reconstruction of CZT took place during 2002 – 2003. It embraced a lot of measures, the first activities included the disassembly of old boilers for dust brown coal and the interconnection of original individual CZT systems. More
 

 
 
 
 
 
The Project was aimed at replacing the TEDOM MT 22 Generation 1 Cogeneration Units - three pieces originally - for the more modern, efficient, and reliable units while maintaining their approximate output. More